Prime Property Renovations
Menu
Pools and outdoors

What to record before a pool refurbishment

A useful pool brief describes what you can see and when it happens. This makes the first visit more productive and helps distinguish surface work from investigation.

Keep a short observation log

Record water levels at comparable times and note top-ups, pool use and equipment cycles. Photograph cracking, loose coping and discoloured areas. Leave diagnosis to the site assessment.

Look beyond the waterline

Include steps, lights, terrace edges and equipment access. If paving is changing, discuss the finished level at adjoining doors and where surface water will run. Bring a photo taken from the seating area as well as close-ups.

Define the return to use

Ask the contractor to set out the proposed inspection, curing, refilling and commissioning stages for the selected system. Agree who will handle maintenance and which care instructions come with the new finish.

Your project

Tell us what you want to change.

Request a free quote