Plan a bath-to-shower conversion around access, screen clearance, drainage and the tile repairs left behind.
Mark out the usable opening
Measure the space between finished walls and show which way the bathroom door swings. Mark the proposed screen position on the floor with tape. Walk through the opening and reach for the controls from outside the spray area. Include the towel rail and vanity in the sketch.
Ask what is beneath the bath
A bath can hide unfinished walls, a change in floor level or a drain in an awkward position. Ask the contractor to distinguish what is visible at survey from what can only be confirmed after removal. Request a separate allowance for hidden work and agree how it will be approved.
Specify the edges of the job
The shower quotation should identify the screen and fixings, drainage, waterproofing, tile finish, control positions and how adjoining surfaces will be made good. If matching tiles are unavailable, choose a deliberate finish boundary such as a complete shower wall.
Agree on the handover
Ask who will check the drainage, seals and door clearances before use, and when the installer says the shower can be used. If this is the only bathroom, discuss temporary arrangements before booking removal.

